Hotel on Surikova street

Reconstruction of unfinished office building into a hotel


    Hotel on Surikova street - Individual project - Present state | project

Technical issues:

  • Structural volume 17596,87 м3
    bellow ground 3099,03 м3
    above ground 14497, 84 м3
  • Footprint 762,95 м2
  • Total building area 3667,93 м2
    incl. basement area   628,40 м2
  • A number of hotel rooms — 23 within:
    S=76,33 м2 — 1 
    S=74,16 м2 — 2 
    S=64,65 м2 — 2 
    S=38,24 м2 — 2 
    S=36,93 м2 — 10 
    S=33,96 м2 — 2 
    S=33,44 м2 — 4

Reconstruction into a hotel

The reason for reconstruction of an unfinnished office building is a changes of typology. New function — hotel

Zonning:
1-st floor — enterance-reception group
2-nd floor — administrative space of the hotel.
3-5th floors — hotel rooms 
Upper technical floor and basement — networks.

A main enterance for public is turned to Surikova str, the secondary — to Marksa str. 1st and 2nd floors are united through an internal staircase. Entrance areas for personel, loadings, garbage removal are split. The building has two 100 kg freight elevatrors and one — 1000 kg for passengers

In order of reconstruction there is a full remake of plans and network systems within guidlines producible towards modern aparthotels. Due to the external look of the building remained the same and public spaces were turned into hotel rooms, some planning solutions keep typical "history tracks". Solid glazing of room walls, open metal ellments of vertical truss, loophole windows allowed to achieve a sharp image of designer-hotel in the city centre.

-

Authors